Wednesday, January 12, 2011

Quick Update

Access to the office has been cut off courtesy of the Brisbane floods so I have unexpectedly found myself with some extra time on my hands.  I thought we'd utilise this and go check out to the house site to make sure that it wasn't under water (all is dry :-))

The site manager was at the house when we went out for a sticky beak. He was able to give us a brief update on what has been planned (this could change once the impact of the flood recovery becomes more apparent)

PAINT -   painters currently on site they need another week or so to finish
FRONT DOOR - scheduled for delivery i think he said 20th Jan
STONE TOPS - kitchen / vanity bench tops have already been been measured up and should be installed in about 1.5 - 2 weeks
FIX OFF -  plumber and electrician to start in about 2 weeks (they have to do the neighbours each side of our house first)
RENDER - when he gets a run of dry weather
EXTERNAL TILING - as above

I expect to see some delays from here on in as supply lines have been cut.

We are more than happy to wait considering that we have been lucky enough to escape the floods unscathed (despite losing power for a period - no biggie) which is much more than can be said for LOTS!! of the other residents of Brisbane (and the rest of Queensland)

A few current photos showing paint progress: