We didn't expect to see much happening at the end of this week (Friday was a training day for all Plantation Homes employees). We were pleasantly surprised to find that this assumption was wrong!
Heaps has been happening! The roof is finished, the electrician and gas fitter have done their rough in/s, the downstairs gyprock has been delivered, the lower level walls have been wrapped in insulation, and the brickies have started on the columns and walls.
As far as services go we all we need now is for the audio visual cabling and they should be good to go with the wall linings.
They have also taken down the scaffold from the front so we can get a better view of the front of the house.
You can see the size of the bricked up feature columns |
Now that the downstairs is wrapped in insulation we can start to get a real feel for the rooms!
Entry and study |
Home theatre |
Living |
Neighbours house |
The tree out the front is not looking very healthy - looks like we are going to have to give it some attention in order to save it. |
Andrea tends to the garden |