A fair bit has been happening since my last post.
- The upper roofing is finished
- The plumbers have done their rough-in
- All the windows & external doors have been installed.
- The photo voltaic cells have been installed on the upper roof for the solar power
|  | 
| Colorbone 'Dune' roof and gutters with 'Surfmist' fascia | 
|  | 
| Windows and doors installed | 
Particularly excited to see the timber stackers which will open up the main living area to the outdoors
|  | 
| Timber stacking doors to alfresco area | 
All the bricks are on site so hopefully we will see some walls going up now that the windows are in. (the neighours place is all bricked up so I am hopeful that the same crew will roll straight on to our place)
There is also gyprock on site. The electricians havent been through yet so the plastering might still be a little way off.
|  | 
| A big pile of gyprock sitting in the upstairs living area | 
No comments:
Post a Comment