As suspected we didnt end up getting any concrete this week which is a shame as the weather was really good.

All the formwork, void formers and reo are in place ready for the pour. The 'Plantation Homes' place two doors down is now at the same point as us so hopefully we will both get some concrete placed early in the week ready for the arrival of our frame on Tuesday!! Here are a few updated pics:

Andrea checks that the garage will be big enough

N/W corner showing setdown slab for water tank


Alfresco looking into dining (left) and living (right)

We also have power and water connected


Our power box and garden tap (on the ground)