We got back from holidays yesterday so we were eager to head out to the house today and see what had happened during plantations last week before Xmas shutdown.
We were resigned to the fact that we would probably only be able to peer through the windows as the place would most likely be locked up.
To our surprise there were a couple of tradies working on site (filling the gaps to the architraves and skirting's) so we were able to get in and have a good look around.
The joinery is in and tiling is at about 40% they still have to do the front columns and the walls in the bathrooms. They also need to do all the grouting.
Very happy with our kitchen selections The dark cupboards are in Laminex 'licorice linea' in silk finish (this is glossy but its a bit dirty at the moment so you don't get the full effect) the lighter colour cupboards are Laminex 'paperbark'.
|
Kitchen |
|
Pantry |
|
Laundry |
Laundry cabinets are Laminex 'oyster linea' in silk finish and the top is in 'peruvian clay'
|
Powder room (downstairs) |
|
Bathroom |
|
Bath |
|
Ensuite (the guy was working in here) |